• FAQ
  • Contact
  • Deutsch Deutsch German de
  • English English English en
  • Italiano Italiano Italian it
  • Español Español Spanish es
  • Русский Русский Russian ru
You have questions? Give us a call: +49 4498 92326-26
Emission Partner GmbH & Co. KG
  • Applications
    • Biogas
    • Natural gas
    • Sewage gas
    • Landfill gas
    • Mine gas
    • Greenhouses
    • Large power plants
    • Emergency power systems
  • Company
    • About us
    • Service offers
      • Consulting
      • Development
      • Manufacturing
      • Service
    • History
    • Career
    • Contact
    • News
  • Catalysts
    • Three-way catalysts
    • SCR-Catalysts
    • Oxidation catalysts
    • Particle Filter
  • Measurement
  • References
  • Recycling
  • Downloads
  • SHOP
  • Search
  • Menu Menu
Emission Applications

Large power plants

Conventional large-scale power plants are still used to generate electricity and heat. Up to now, large power plants have used gas-steam turbines for energy conversion. Recently, large gas engines have also been used. In particular, they are used for primary energy production. However, today’s energy market and the further expansion of renewable energies increasingly require large power plants to operate flexibly. Particularly in the partial load ranges that are now more frequently encountered, the emissions of the power plants increase and require exhaust gas aftertreatment. Emission Partner offers you the right exhaust gas aftertreatment for your large power plant.

The 44th BImSchV applies to medium-sized combustion plants, gas turbines and internal combustion engines with a capacity of 1 to 50 MW.
Large combustion plants (incl. gas turbines and internal combustion engines) with an output greater than 50 MW are regulated by the 13th BImSchV. The following limit values apply to natural gas-fired plants:

CO: 500 mg/Nm³
NOx: 1000 mg/Nm³
Total dust: 50 mg/Nm³
SOx: 350 mg/Nm³

These emission values must be continuously monitored and reported to the authorities.

Technologies

Oxidation catalysts

SCR-Catalysts

Diesel particulate filter

You operate a large power plant and still need a catalyst?

We will be happy to help you. Contact us!

E-Mail
Phone

Low emissions become a continuous task!
Our solution: EMI-LOG classic!

The 44th Ordinance of the Federal Immission Control (BImSchV) replaces the previously valid TA Luft, which regulated the emissions of combustion engines since 2002. All plants requiring a permit smaller than 1 MW and all plants with more than 1 MW rated thermal input are affected.

The regulations have been further specified by the Federal/State Working Group for Immission Control (LAI) on the basis of VDMA Standard Sheet 6299 and extended to all plants that receive the emission reduction bonus.

With the passing of the 44th BImSchV, in June 2019, Emission Partner has launched the EMI-LOG emission monitoring system to offer you as an operator a simple, stable and functioning solution.

EMI-LOG is an engine manufacturer independent and self-sufficient solution for all engine types, and in addition to continuous compliance with emission limits, you can also meet the requirement of effective operation of your catalyst.

The data to prove the effective operation of the exhaust aftertreatment system is stored DSGVO compliant, both locally and accessible to you in a cloud. With the conclusion of a service contract, you receive automated monthly/annual reports as proof for your authority.

  • Simple retrofit

    Geeignet für alle Motorentypen und einfach nachrüstbar

  • Reduced documentation effort

    Automatisierte Dokumentation der Messdaten und Ausfallzeiten

  • More transparency with CO sensor

    Nachweis der Katalysatoraktivität und nachvollziehbarem Katalysatortausch

  • Immediately available

    Jetzt bestellen und innerhalb weniger Tage installieren

More information on www.katalysatorüberwachung.de

Get in touch with us….

…if you want to be secured for the future and even
and even stricter limit values.
We are happy to help you!

Phone
E-Mail

This post is also available in: German

Sale

Emission Partner GmbH & Co. KG
Karl-Wiechert-Allee 66
30625 Hanover

Phone: +49 4498 92 326 – 26
Fax: +49 4498 92 326 – 112
Bild


Production

Emission Partner GmbH & Co. KG
Industriestraße 5
26683 Saterland-Ramsloh

Phone: +49 4498 92 326 – 0
Fax: +49 4498 92 326 – 112
Bild
  • Company
    • About us
    • Service offers
      • Consulting
      • Development
      • Manufacturing
    • History
    • Career
    • Contact
    • News
  • Applications
    • Combined heat and power plants
      • Biogas
      • Natural gas
    • Greenhouse facilities
    • Construction machinery
  • Emission measurement
  • References
  • Recycling & Complaint
  • Downloads
Contact | Privacy | Career | FAQ | GTCB | GTCP | Imprint© 2019 Emission Partner GmbH & Co. KG
Scroll to top
Cookie-Zustimmung verwalten
Wir verwenden Cookies, um unsere Website und unseren Service zu optimieren.
Funktional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Vorlieben
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistiken
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage vendors Read more about these purposes
Einstellungen anzeigen
{title} {title} {title}